While work was ongoing at the Solana plant, Straight Line and Ram Jack were working with Abengoa on a second, 250MW solar installation in the Mojave Desert in California.

Much higher seismic and wind loads, and stricter oversight from the California Energy Commission required the system to be redesigned for much higher loads. Different soil conditions also opened the door to explore the use of helical piers for 80% of the piles in the field.

For this project, three types of foundations were installed:

  • 10,000 12” diameter, 10’ depth micropiles

  • 10,000 8” diameter, 8’ depth micropiles

  • 38,000 3.5” helical piers with 8” and 10” helices installed to depths of 6.5-10”


With ten or more work crews spread throughout the 1,800 acre site, close communication was required to maintain efficiency and quality control standards.





Schedule an

Evaluation

Need foundation repair for your home or business? Request a professional, on-site evaluation by contacting our team today.

Choose your project type:

Colorado: 719-545-9942

Arizona: 480-941-3448

New Mexico505-771-8890

ROC# 269692 / ROC# 291336 / ROC # 312650

© 2020 by Straight Line Construction Co. & Ram Jack

CONTACT

Colorado: 719-545-9942

Arizona: 480-941-3448

New Mexico: 505-771-8890