Baker Job

Mini-compaction grouting performed on the sunroom floor.

BEFORE:

1). 1 ¾” holes were drilled through the concrete slab in eight locations and a low-mobility grout was injected at a depth of 6’ below the slab, and grouted from the bottom up.

AFTER:

2).The slab was raised to maximum practical recovery. The holes were patched and the work area was cleaned.